SolarCostData Live

UTC --:--:--.-

Highest · Demand · NEM South Australia: 1224 MW, 23 Oct 19:30 UTC

State checked

Highest since we started · Demand · NEM South Australia. Tracked since 23 Oct 2026, the first date in our data for this series. This is not a historical record.

Status: Superseded · since 23 Oct 2026 · superseded by a newer value

1224M MW

Sources & licences

Data: Source: Australian Energy Market Operator (AEMO), NEMWEB. source licence Derived numbers and charts: CC BY 4.0, SolarCostData Data Desk (licence). Source data keeps its own licence.

Demand peak around 2026-10-23 19:30 UTC: minimum 440, maximum 1376 MW; the tracked point is marked.137644010-23 17:55 UTC10-24 07:30 UTC · MW
Series around the value

Series around the value; the marked point is the tracked interval. Derived by SolarCostData from the published values.

Context

Highest since we started · Demand in NEM South Australia: 1224 MW in the 5-minute interval starting 2026-10-23 19:30 UTC. We have tracked this market since 2026-10-23. The window is short, so this says nothing about earlier years.

It beat the previous value of 1208 MW, set at 2026-10-23 18:25 UTC, by 16.50 MW (1.4%). That earlier value stays in the chain as superseded and remains visible at /records/demand-peak-sa-1792779900/.

Conditions in the data at the same time: NEM-SA1 price rt5 119.5 AUD/MWh (reading at 19:30 UTC). These are the readings nearest to the tracked interval in the same database, shown for context only; they do not explain the value on their own.

First seen in a batch fetched at 2026-10-23 19:33 UTC (payload 1a15605cc0). It was checked after a second batch fetched at 2026-10-23 20:18 UTC (payload 5bf694df2b): a later batch arrived, this feed does not republish old intervals, and the stored point stayed unrevised, unflagged and within 2%.

For comparison, the next most extreme valid reading in the same series is 1418.8 MW at 2026-10-24 09:40 UTC, out of 484 readings in the window.

These values are built from provisional operator data that can be revised, so each one is checked against later batches before it is marked Tracking and can be withdrawn if the source changes it. Readings outside market bounds, with a wrong unit, flagged by a quality gate or showing a price jump without a matching load change are rejected and never listed. See the methodology page for the full rules. Not for trading or operational decisions. Provisional data.

Previous value in this chain: 1208 MW, state superseded.

Not for trading or operational decisions. Provisional data.