Tasmania electricity price today
NEM Tasmania used today
16,038MWhD
Metered to · ticking at the last metered rate
5-min real-time price 97.52M AUD/MWh · RT5
Now
5-min real-time price
97.52M AUD/MWh
RT5 ·
Demand
878M MW
Last 24 hours
Min 26.84, max 204.24, latest 97.52 AUD/MWh. Line breaks mark gaps longer than two reporting intervals.
Baseline building: 1 of 28 days.
Min 874, max 1195, latest 878 MW. Line breaks mark gaps longer than two reporting intervals.
Baseline building: 1 of 28 days.
Generation mix
This market publishes no generation mix.
About this market
Tasmania is the TAS1 region of the National Electricity Market, an island at the end of a single undersea cable. The page shows AEMO’s five-minute spot price and the regional demand. The defining feature is hydropower: Tasmania’s generation is predominantly hydro, and the dams store water that can be turned into power on short notice.
That makes Tasmanian prices a story of water and wires. In a wet period with full storages the island exports power to Victoria through Basslink, and the price follows the mainland. When storages are low, the same cable lets the island import, and the hydro operator has to decide when to hold water back. Price differences with Victoria therefore tell you more about the cable and about reservoir management than about short-term demand.
Basslink is rated at about 500 MW, which is small compared with the mainland regions, so Tasmania can be cut off from mainland prices when the link is full or out of service.
We show no generation mix for Tasmania, so the hydro share is not displayed here. Prices are five-minute dispatch prices in Australian dollars, and NEM time is AEST, ten hours ahead of UTC, although Tasmania’s local clocks run an hour ahead of it whenever daylight saving applies.
Source
Source
AEMO (AU) · licence · Source: Australian Energy Market Operator (AEMO), NEMWEB · fetched ·
Fuel mix not collected until AEMO's own Registration and Exemption List is available (Cowork 2026-10-23).
Facts
- TAS1 is the NEM region for Tasmania, joined to the mainland only by the Basslink HVDC cable to Victoria.
- Basslink is about 370 km long, of which roughly 290 km is submarine cable, and is nominally rated at 500 MW. Source: APA
- Basslink can carry up to 630 MW northward from Tasmania to Victoria for short periods, above its 500 MW nameplate rating. Source: APA
- Tasmania's generation is predominantly hydro. Source: Hydro Tasmania
- Tasmania's local standard time is AEST (UTC+10), the same as NEM market time; when daylight saving applies, local clocks run one hour ahead of it. Source: Bureau of Meteorology Source: AEMO
- Five-minute settlement began on 1 October 2021; dispatch prices carry interval-end stamps in the AEMO files. Source: AEMC
- The market price cap for 2026-27 is A$23,200/MWh. Source: AEMC
- Currency: Australian dollars (AUD).
Other markets
5-min real-time price in other markets
- NEM New South Wales: 102.39M AUD/MWh
- NEM Queensland: 91.28M AUD/MWh
- NEM Victoria: 94.32M AUD/MWh
- NEM South Australia: 103.80M AUD/MWh
Demand in other markets
- Great Britain: 25140M MW
- Denmark: 5954D MW
- NEM New South Wales: 6547M MW
- NEM Queensland: 5836M MW
- NEM Victoria: 4530M MW
- NEM South Australia: 1245M MW
- Taiwan: 26238M MW
- ERCOT (Texas): 44674M MWhourly · EIA-930 preliminary · delayed
- PJM Interconnection: 78578M MWhourly · EIA-930 preliminary · delayed
- MISO: 61910M MWhourly · EIA-930 preliminary · delayed
- ISO New England: 11022M MWhourly · EIA-930 preliminary · delayed
- Southwest Power Pool (SPP): 26473M MWhourly · EIA-930 preliminary · delayed
Cite this
SolarCostData Data Desk (2026). NEM Tasmania electricity data, solarcostdata.com/markets/tas/, accessed 2026-10-25. Source data: Source: Australian Energy Market Operator (AEMO), NEMWEB.
Download last 24 h: data.csv · data.json (CC BY 4.0 (our figures); source data: Source: Australian Energy Market Operator (AEMO), NEMWEB)
Not for trading or operational decisions. Provisional data.